Deadline

Main Use

The Deadline tool is used to ensure that tasks are completed before the deadline – aka the latest time or date by which something should be completed.

Overview

As Analysis

Defining a deadline

  1. Time Interval: An amount of time (seconds, minutes, hours, days, months, or years) after an event in which other events are expected to occur
    ex) An insurance claim should have an adjuster assigned within 5 hours of information being received
  2. Cutoff time: If an event or events started by specific time, then the expected events will occur by another set time.

Running the deadline analysis will display timelines that missed the deadline and gives users the ability to filter deadlines into set.

As an Alert

You can build a “stage of alerts”. This is the ability to age more conditions. i.e. Alert someone before the deadline is breached. Notify manager if the breach of deadline occurs. Escalate issue to alert/notify someone else or trigger a software system to perform a task.

Example Video Demonstration

05_Deadline.png

Example

Defining a deadline by a simple amount of time: In an insurance claim once a claim has been opened and setup, an adjuster must be assigned within 8 hours. The 8 hours is the amount of time for the deadline. This means that within 8 hours of events ‘claim opened’ and ‘claim setup’, the ‘adjuster assigned’ event must happen otherwise the alert is triggered.