Differences between two update methods of Document Definition Datasets

Updating your Dataset via Document Definition GUI or by using command-line interface command basically performs the same action.

There are no differences in terms of the updating logic. The only difference is the logging level and format.


When using the command-line interface - the update from the command line takes place in the background, a restart of the Project Setup Station might be required for checking the state of the datasets after the update to make sure no caching in the FC client causes differences.

If the first time when you run your command results in a not fully updated Dataset, please consider waiting a couple of minutes as it is most likely updating in the background, and the delay is caused by the size of your data. 

In case it was not updated even after some time, please consider running the command a second time (it usually fixes an issue when your dataset appears not fully updated).

Related articles:

How to schedule a data set update for FlexiCapture 12 Distributed
Updating data sets

Was this article helpful?

0 out of 0 found this helpful

Have more questions? Submit a request

Comments

0 comments

Please sign in to leave a comment.