Hello,
Currently, We are working on Flexicapture Version 12 - R2 and Build Number id 12.0.2.3063. We have 50+ active Projects running and our service is 7/24. The flexicapture team has released a new version R3(New Build Number: 12.0.3.2525). We want to upgrade from R2 to R3. Please suggest how we can plan for upgrading and backup process?
What are the steps for upgrading the version for R3? please suggest.
Comments
6 comments
You shouldn't have too much trouble. Follow the steps in the documentation for an upgrade.
We will take backups of each project just in case. Open each project and go to "Project > Export Project".
The most important thing to me is doing the upgrade in a non-production system first! This will give you, at least, an idea of what you might run into in production. Not a guarantee of success, but this usually shows me a few things I have trouble with.
thank you, where I will find the documentation?
Can you Please share the link.
It is in the "fcadminguide0.pdf" file in the installation media. There is a section on upgrading.
http://www.abbyydownloads.com/fc12/r3/FC12_AdminGuide_12.0.3.2525.pdf
We have already worked on flexicapture 12 - R2 Release, Now we want to upgrade R2 to R3. PDF contains steps for the flexicapture 10 and 11 version upgrade.
Thanks
This is all the documentation that I am aware of. You will need to reach out to support.
Please sign in to leave a comment.