Community

Exporting Project from project setup station taking more time

Hi,

 I'm trying to export project from project setup station(FC for invoice project type). It's taking more time to export a project (approx. 4-5 hours) . Please assist.

Note: I have to move project from one server to another. Exporting the project in high performing server where Abbyy FC server installed. still exporting very slow.

Thanks

Mani

0

Comments

3 comments

  • Avatar
    Manikandan

    Hi ,

    Adding to the above point. I've seen event log and got - FlexiBr: An executor has been found that has been idle for too long: {C8354CDD-E33F-4D13-B781-B5E055FCC22D}. The executor will be stopped.

    Thanks

    Mani

    0
  • Avatar
    Scott Chau

    Mani,

    How Large is your project?  Meaning, do you have lots of DocDef and lots of training batches and sample images in the training batch?  If so it will take awhile you export those project.  It might be hitting the IIS time out.  Create a support case.  I know there is a setting to extend that timeout and support can give you instruction how to modify that.

    Another option if you don't need some parts of your Project, you could export parts of it by using the commandline tool.  https://help.abbyy.com/en-us/flexicapture/12/admin_guide/projects_administration_commands

    With that command line tool you could also compact your project which might help with shrink it down a bit.

    0
  • Avatar
    Manikandan

    Thanks Scott..

    My Project size is 550MB approx, My Project contains only one Doc def. But I see lots of training batches are there(after project export, I see training batch folder size is 18GB).

    Thanks

    Mani

    0