Hi,
Currently there are no events-scripts-locations present in ABBYY for 'End of Character Verification'. I want those events for scripting because I want to log the time spent for verification for respective document.
May be the event 'Field Verification Request' can be used for tracking start of F7, but there is no event to track end of F7.
My scenario: Currently I am using Doc Open and Doc Close events for logging time spent on respective doc. But F7 starts after closing the doc so I am not able to include that time in verification time of respective doc.
I am using Flexicapture 11 Dstributed.
If anybody knows how to track Character Verification time-span then please share.
Thanks in advance.
Character Verification(F7) : Start and End tracking
この記事は役に立ちましたか?
0人中0人がこの記事が役に立ったと言っています
コメント
1件のコメント
Hello,
Please address this question to the regional support. Send them your project, sample images and scenario the description.
サインインしてコメントを残してください。