Question
How to stop the processing of a huge document? If to remove the file manually, FlexiCapture will still process the batch. After canceling the recognition task from a respective Processing Station, some other Processing station begins processing the same file again.
Answer
It is better to end the task, stop stations, then either remove the batch from the Project Setup Station or send the batch to the stage which does not have automatic processing, for example, to the Verification stage.
Comments
0 comments
Please sign in to leave a comment.